Introducing a stunning new-construction Colonial set on a full acre of prime Scarsdale land, this magnificent residence offers the rare opportunity to enjoy brand-new luxury living in one of Westchester County's most coveted communities. Completed in 2025, this expansive home delivers over 6,000 square feet of thoughtfully designed living space, featuring six generous bedrooms and the timeless elegance that defines classic Colonial architecture. Every detail reflects the quality and craftsmanship expected of a home of this caliber, providing a blank canvas for refined living from the very first day.
Situated on a beautifully proportioned one-acre lot, the property offers both privacy and presence, with the kind of gracious setting that defines the Scarsdale lifestyle. The generous acreage provides ample room for outdoor enjoyment, entertaining, and landscaping possibilities, all within the heart of a community renowned for its top-rated schools, tree-lined streets, and vibrant village center. With easy access to commuter rail service and the finest shopping and dining Westchester has to offer, this exceptional new home represents a rare convergence of modern construction, generous scale, and an incomparable address.
Property Information
Property information details
Address
54 SHELDRAKE RD, SCARSDALE
SBL
17.01.103
Property Type
1 Family Res
Building Style
COLONIAL
Zoning
1 ACRE
Lot Size
1.00 acres
Structure Details
Building structure details
Year Built
2025
Living Area
6,084 sq ft
Stories
2.0
Bedrooms
6
Full Baths
7
Half Baths
2
Kitchens
1
Fireplaces
1
Exterior Wall
06 - Stucco
Heat Type
3 - Hot Water \ Steam
Fuel Type
9 - PROPANE/LPG
Central Air
Yes
Basement Type
4 - Full
Finished Basement
2,609 sq ft
Condition
6 -
Assessment Values
Land Assessed Value
$1,500,000
Total Assessed Value
$5,200,000
Full Market Value
$7,457,335
Tova Bourque
Sotheby's
Tova Bourque is an award-winning real estate professional serving Scarsdale, Westchester, and New York City. A long-time Scarsdale homeowner and resident herself, she brings unmatched local market knowledge, community insight, and firsthand understanding of what makes each neighborhood special. Known for her honest, direct approach and fierce advocacy, Tova combines deep expertise with thoughtful attention to detail to help her clients achieve the best possible outcome — every time.
Sales History
Property sales history records
Sale Date
Sale Price
Deed Book/Page
$3,500,000
61364/3633
$1,375,000
40005/0457
Improvements
Property improvement records
Structure
Sq Ft
Dimensions
Condition
Year Built
RP2 - PORCH, COVERED
112
—
5 - VERY GOOD
2025
LP8 - PATIO, FLAGSTONE IN
4,139
—
5 - VERY GOOD
2025
GN1 - Generator, Residenti
—
—
5 - VERY GOOD
2025
LP8 - PATIO, FLAGSTONE IN
—
—
5 - VERY GOOD
2025
RG1 - Garage, 1 Sty Attach
871
—
5 - VERY GOOD
2025
LR3 - POOLHOUSE, DELUX
308
—
5 - VERY GOOD
2025
KO1 - Kitchen,Outdoor
128
—
5 - VERY GOOD
2025
LS4 - POOL, GUNITE
800
—
5 - VERY GOOD
2025
CP5 - CANOPY, ROOF ONLY
300
—
5 - VERY GOOD
2025
Building Permits
Building permit records
Date
Type
Status
Description
CO Date
STREET OPENING - DRIVEWAY
OPEN
NEW CURB CUT
TREE REMOVAL
CLOSED
REMOVAL OF (1) 30" DBH LEANING PIN OAK TREE, (1) 24" DBH DECLINING PIN OAK TREE, AND (1) 18" DBH DECLINING ASH TREE. ARBORIST LETTER PROVIDED. PHOTOS PROVIDED.
PLUMBING
OPEN
PLUMBING GENERATOR / GAS TEST
PLUMBING
OPEN
PLUMBING FOR POOL, HEATER, FIRE PIT & BBQ
GENERATOR
OPEN
GENERATOR - 24kw, NATURAL GAS
2/2/26: The generator permit needs:
1) An Electric Certificate for the generator and transfer switch to be submitted and approved
2) Gas Test/Final Plumbing Inspection to be scheduled and passed
3) Schedule and Pass Final Operational Inspection with the Scarsdale Fire Inspector / 914-722-1219
4) After the above are completed, Schedule and Pass a Final Building Department Inspection
Your copy of the approved plans must be on site when someone meets our inspector.
5) After Final inspection passes, submit closeout paperwork, Application for Certificate of Occupancy,
Certification of Final Cost, and $200 CO Fee. There are additional costs of the original construction
Estimate of $12,700 was exceeded / Joe O'B
PLUMBING
OPEN
PLUMBING FOR POOL CABANA
BAR
OPEN
POOL, PATIO, CABANA, PERGOLA, ENTRANCE PIERS & DRIVEWAY
9/16/25: Cardillo Pools submits letter that they are only responsible for the swimming pool and spa, not the Bar, Patio, Pergola, Entrance Piers or Drainage. Cardillo also stated they are not responsible for work performed by other parties.
2/3/26: Pool, Cabana, Patio, Pergola, Entrance Piers Permit
------------------------------------------------------------------------------------------------------------------------
This permit needs:
1) Architect to inspect & submit Footing Certification should cover Cabana, Patio, Pergola and Piers.
2) Architect to inspect & submit Foundation Certification
3) Architect to inspect & submit Framing Certification
4) Architect to inspect & submit Insulation Certification / If Spray Foam Used, Installer to submit Spray Foam Certification
Stating locations where spray foam was used and the R Values
5) Pool Company to submit Entrapment Certification
6) Pool Company to submit Pool Cover Certification
7) Pool Company to submit Pool and Spa Alarm Certification
8) Architect to submit Final Landscape Certification
9) Architect to inspect & submit terminals of mechanical draft and direct vent systems Certification
10) Close Stormwater Erosion Control Permit (SWEC) / There are also several open street opening and tree permits.
Contact the Engineering Department for SWEC, street opening and tree permits / 914-722-1106
11) Final Building Inspection by Building Department and Final Plumbing Inspections for two plumbing permits
Separate Plumbing for Cabana and Separate Plumbing for Pool, Heater, Fire Pit & BBQ, gas test passe for this permit in March 2025 / Joe O'B
----------------------------------------------------------------------------------------------------------
2/6/26: Pool Entrapment and Pool Cover Certs submitted and approved / Pool cover Cert
covers Pool Alarm / Joe O'B
STORMWATER MANAGEMENT - ADDITION/ ALTERATION
OPEN
PROPOSED POOL, CABANA, PATIO AT REAR OF HOUSE, AMEND DRIVEWAY CONFIGURATION. THIS PERMIT SUPPLEMENTS SWEC 2022-122. DESIGN ENGINEER SHALL CERTIFY ALL DRAINAGE, ELEVATIONS AND PERMEABLE PAVER SYSTEMS.02/10/2025 - AMENDMENT - REVISED POOL LOCATION/PATIO AND DRIVEWAY FRONT COURT. 01/16/2026 AMENDMENT - ADDITION OF SWALE ALONG LEFT SIDE OF PROPERTY.
PLUMBING
COMPLETED
32 FIXTURES - NEW HOUSE
CHP
COMPLETED
CHP - DEMO HOUSE WITH GARAGE BUILT IN 1956
BAR
OPEN
NEW HOUSE X2
PERMIT STILL OPEN, ONLY TCO ISSUED UNTIL FEB 5th 2025 DWS
TCO PAID FOR TILL NOVEMBER 5th 2025 ON SEPT.30, 2025 DWS
9/16/25: : It would appear Owner submitted letter changing landscapers (undated letter), Landscaper submitted letter that work is in progress (dated 7/29/25) and Lot Coverage was submitted (undated) but not reviewed, possibly pending submission of final survey, the two letters were not entered into municity? Amendment for Basement Changes & Driveway Circular to single driveway/Landscaping removed from permit was approved on August 1, 2025. Otherwise, nothing has been done since the TCO was issued on August 5, 2025 Joe O'B
PENDING REVISED STORMWATER - 09-24-2025
8/1/25: Amendment for Basement Changes, & Driveway/Landscaping removed from permit and other changes is approved
9/30/2025 - need approved amended swec, final survey, lot coverage, landscape cert, mechanical draft cert before final. vw
12/19/25: Owner stops by and extends TCO to February 5, 2026 / Eliot Senor to submit Final
As Built Survey, Lot Coverage and SWEC Certifications by Monday, December 22nd
TCO and Receipt emailed to Owner / Joe O'B
2/2/26: Final Survey, Lot Coverage, Mechanical Draft Cert all submitted and approved.
Still need Landscape Cert and maybe Pre-Engineered Lumber Sign to be Mounted.
Final SWEC amendment is approved, needs to be stamped. Final SWEC Inspection pending
melting of all the Snow / Joe O'B
2/3/26: For the House permit, as far as I can see, we need:
1) Stormwater Permit Closed
2) Landscape Certification
3) Proof that the Pre-Engineered Truss Warning sign is mounted on the house
4) Was there a Lawn Sprinkler system installed? (Not a Fire Sprinkler)
5) Final Building Department Inspection /Despite having a TCO, there still needs to be a final
inspection that passes.We need to confirm all the “To Do” List Items for the TCO have been
completed / Joe O'B
BAR
OPEN
NEW HOUSE X2
PERMIT STILL OPEN, ONLY TCO ISSUED UNTIL FEB 5th 2025 DWS
TCO PAID FOR TILL NOVEMBER 5th 2025 ON SEPT.30, 2025 DWS
9/16/25: : It would appear Owner submitted letter changing landscapers (undated letter), Landscaper submitted letter that work is in progress (dated 7/29/25) and Lot Coverage was submitted (undated) but not reviewed, possibly pending submission of final survey, the two letters were not entered into municity? Amendment for Basement Changes & Driveway Circular to single driveway/Landscaping removed from permit was approved on August 1, 2025. Otherwise, nothing has been done since the TCO was issued on August 5, 2025 Joe O'B
PENDING REVISED STORMWATER - 09-24-2025
8/1/25: Amendment for Basement Changes, & Driveway/Landscaping removed from permit and other changes is approved
9/30/2025 - need approved amended swec, final survey, lot coverage, landscape cert, mechanical draft cert before final. vw
12/19/25: Owner stops by and extends TCO to February 5, 2026 / Eliot Senor to submit Final
As Built Survey, Lot Coverage and SWEC Certifications by Monday, December 22nd
TCO and Receipt emailed to Owner / Joe O'B
2/2/26: Final Survey, Lot Coverage, Mechanical Draft Cert all submitted and approved.
Still need Landscape Cert and maybe Pre-Engineered Lumber Sign to be Mounted.
Final SWEC amendment is approved, needs to be stamped. Final SWEC Inspection pending
melting of all the Snow / Joe O'B
2/3/26: For the House permit, as far as I can see, we need:
1) Stormwater Permit Closed
2) Landscape Certification
3) Proof that the Pre-Engineered Truss Warning sign is mounted on the house
4) Was there a Lawn Sprinkler system installed? (Not a Fire Sprinkler)
5) Final Building Department Inspection /Despite having a TCO, there still needs to be a final
inspection that passes.We need to confirm all the “To Do” List Items for the TCO have been
completed / Joe O'B
BAR
OPEN
NEW HOUSE X2
PERMIT STILL OPEN, ONLY TCO ISSUED UNTIL FEB 5th 2025 DWS
TCO PAID FOR TILL NOVEMBER 5th 2025 ON SEPT.30, 2025 DWS
9/16/25: : It would appear Owner submitted letter changing landscapers (undated letter), Landscaper submitted letter that work is in progress (dated 7/29/25) and Lot Coverage was submitted (undated) but not reviewed, possibly pending submission of final survey, the two letters were not entered into municity? Amendment for Basement Changes & Driveway Circular to single driveway/Landscaping removed from permit was approved on August 1, 2025. Otherwise, nothing has been done since the TCO was issued on August 5, 2025 Joe O'B
PENDING REVISED STORMWATER - 09-24-2025
8/1/25: Amendment for Basement Changes, & Driveway/Landscaping removed from permit and other changes is approved
9/30/2025 - need approved amended swec, final survey, lot coverage, landscape cert, mechanical draft cert before final. vw
12/19/25: Owner stops by and extends TCO to February 5, 2026 / Eliot Senor to submit Final
As Built Survey, Lot Coverage and SWEC Certifications by Monday, December 22nd
TCO and Receipt emailed to Owner / Joe O'B
2/2/26: Final Survey, Lot Coverage, Mechanical Draft Cert all submitted and approved.
Still need Landscape Cert and maybe Pre-Engineered Lumber Sign to be Mounted.
Final SWEC amendment is approved, needs to be stamped. Final SWEC Inspection pending
melting of all the Snow / Joe O'B
2/3/26: For the House permit, as far as I can see, we need:
1) Stormwater Permit Closed
2) Landscape Certification
3) Proof that the Pre-Engineered Truss Warning sign is mounted on the house
4) Was there a Lawn Sprinkler system installed? (Not a Fire Sprinkler)
5) Final Building Department Inspection /Despite having a TCO, there still needs to be a final
inspection that passes.We need to confirm all the “To Do” List Items for the TCO have been
completed / Joe O'B
STORMWATER MANAGEMENT - ADDITION/ ALTERATION
OPEN
PROPOSED SECOND STORY ADDITION PLUS EXPANSION OF FRONT AND REAR. PROJECT ALSO INCLUDES A NEW CIRCULAR DRIVEWAY AND REQUISITE STORMWATER MANAGEMENT SYSTEM. DESIGN ENGINEER SHALL CERTIFY ALL GRADING AND NEW DRAINAGE FEATURES. OWNER SHALL ACKNOWLEDGE REQUIREMENTS FOR POST CONSTRUCTION DRAINAGE MAINTENANCE AND INSPECTION IN WRITING. 2/14/25 AMENDMENT FOR POOL ZBA CONFIGURATION AND MODIFICATION TO DRIVEWAY MATERIALS.
STREET OPENING - DRIVEWAY
OPEN
SECOND CURB CUT TO CREATE CIRCULAR DRIVEWAY. WORK CALLED FOR ON THIS PERMIT IS PART OF A LARGER RESIDENTIAL RENOVATION COVERED UNDER SWEC/BUILDING PERMITS.